Off-grid solar calculator
Preliminary estimate · draft assumptions need technical review. No enquiry is sent.
ESTIMATE GUIDANCE
What to check when reviewing your estimate
Your typical usage: If you have electricity bills, use the average kWh/day as a starting reference. For a new remote property, prepare an appliance list and estimated operating hours.
Your biggest loads: Bore pumps, hot water, cooking, air-conditioning, workshop equipment and EV charging can affect energy storage and peak inverter capacity.
Your site: Postcode, shading, available solar space and your tolerance for generator use matter, especially during low-production months.
This review tool models editable appliance loads against historical local weather. Household and equipment assumptions still need technical approval; site shading and final installation design require assessment.
AFTER THE ESTIMATE
The calculator starts the conversation. The site assessment completes the picture.
- 01
Check the load list
Confirm appliances, actual running hours, simultaneous demand and equipment with high start-up currents.
- 02
Look at the property
Review mounting location, shading, cabling distances and any existing electrical infrastructure.
- 03
Design for difficult conditions
Consider lower winter generation, usable battery reserves, expected autonomy and generator operation.
- 04
Scope and quote
Once the assumptions are checked, review equipment options, installation needs and a site-specific quotation.
FAQs
Common questions
How accurate is the calculator?
It is an indicative planning tool. It uses assumptions for the property profile, appliance selection and location rather than a complete electrical load assessment. Treat it as a discussion starting point; final sizing requires a more detailed review.
Is the result a quote?
No. The calculator cannot confirm equipment availability, site access, cabling, electrical works, system configuration or installed cost. A quote follows assessment of those requirements.
Why do you need my postcode?
Seasonal solar production varies by location. Postcode helps estimate the site's general solar conditions, though local shading and installation details still need to be checked.
What is the difference between kW and kWh?
Kilowatts (kW) describe the rate at which equipment uses or generates power. Kilowatt-hours (kWh) describe how much energy is used or stored over time. An off-grid design needs to account for both.
Can I run pumps or a workshop off-grid?
Potentially, but motor start-up demand and simultaneous use are important. Provide the pump and tool specifications, plus how often they run, so these loads can be included in a proper assessment.
Do I need a generator?
Not every system has identical requirements. Many remote systems use a generator to help manage extended low-sun conditions, high loads or maintenance. Its role and sizing depend on the property and owner preferences.
Can I install a battery now and expand later?
Expansion depends on the battery, inverter, controls, available space and design compatibility. Tell the team about future building stages or expected load growth before equipment is selected.
Will the calculator save my information?
This review calculator does not save your scenario or result to a customer database, and does not send an enquiry. You can download the review data as a JSON file. The weather provider uses approximate locality coordinates, and historical weather is cached separately from your appliance inputs.
What happens after I submit an enquiry?
This calculator preview does not submit enquiries or email reports. Use Expert Energy's listed phone or email details to discuss the estimate. Lead delivery and the enquiry workflow still need to be connected and tested before launch.
TAKE THE NEXT STEP
Planning off-grid power for a rural home, cabin or working property?
Tell us where the site is and what needs power. We can discuss what information is needed for a property-specific assessment. This review-stage tool does not send an enquiry or an estimate to the team.